Orchard Avenue Reconstruction

Main Street to Wright Lane

The Town of Wolfville has awarded a contract for the reconstruction of Orchard Avenue between Main Street and Wright Lane to MidValley Construction Company (1997) Limited. The work includes replacement of sanitary, storm and water services, street reconstruction including new base materials, asphalt surfaces, concrete curbs and reinstatement of disturbed area(s).

Construction is scheduled to start on or about Tuesday, July 25th, 2016 and installation of temporary water will commence the week of July 18th. The project is expected to be completed by October 7th 2016.  Hours of work will generally be from 7 am to 7 pm.  While construction is ongoing, the work area will be closed to through traffic during work hours, except for emergency vehicles, construction and local resident traffic. 

The public are encouraged to avoid the work area whenever possible to avoid delays and motorists are encouraged to utilize an alternate route to avoid the work area. 

The Town of Wolfville encourages open communication during the construction project, particularly in areas adjacent to your property. On site personnel will make every effort to keep residents informed and advised of scheduled interruptions whenever possible. Hatch will provide on-site inspection services on behalf of the Town of Wolfville. Once construction starts, the Hatch inspector is Jim Heaslip who can be reached at (506) 866 0533. If you have any questions regarding the project please do not hesitate to contact Kevin Kerr, P. Eng., Director of Public Works, at 542-3960 or via email at This email address is being protected from spambots. You need JavaScript enabled to view it.; or the Hatch site representative listed above. Further notifications will be updated at www.wolfville.ca.

For more details on construction related issues that may affect you or your property go to this link:   2016 07 26 Notice to Residents Orchard Avenue Reconstruction